Avalon Drive Main Replacement

TVWD is replacing 800 feet of water main along NW Avalon Drive and NW 179th Place, between NW Tillamook Drive and NW 178th Avenue. Construction is nearly completed and temporary cold-patch pavement has been installed in the work area while we arrange a contractor to perform final paving. Final paving is scheduled for the week of Feb. 11, depending on weather conditions.

Sign up to receive update emails here.Avalon Map - Web Image

What is TVWD doing?

TVWD installed a new section of water main. The project includes 800 feet of new water main, necessary valves, and reconnection of all water services and side street connections within the project boundary.

Why now?

The existing water main is deteriorating and is identified as a high priority main replacement.

Upgrading water mains helps to provide reliable water service into the future, reduces the chance of leaking and broken water mains, and provides greater fire protection coverage.

How does this affect me?

Depending on your property type and use, this project will affect you in different ways and times:

Working Times

Final paving will occur during the week of Feb. 11 between 8:00 am to 5:00 pm, Monday through Friday once scheduled, weather permitting.

Traffic Disruptions

Vehicular and pedestrian access within the project area will likely be limited during final paving. Traffic on NW Avalon Drive will at times be limited to one lane during working hours. Temporary driveway access may be provided but residents should plan to have limited access while paving is in front of their homes.

General Construction Disruptions

During construction, heavy equipment and materials will be located in the work area. These areas will be clearly marked with cones and/or caution tape. When construction is occurring noise and dust may be present.

What Is the Timeline?

Construction is scheduled to begin Monday, November 5. The construction process is expected to take approximately four weeks.

How can I stay informed?

TVWD will provide regular updates about the project by email. Sign up to receive emails at: www.tvwd.org/avalonsignup

Please note that due to a variety of reasons, all timelines are subject to change.

Updated: Feb. 4, 2019